亚洲高清国产拍精品青青草原丨久热爱精品视频在线9丨亚洲乱亚洲乱妇在线丨日本一区视频免费看丨不卡一区欧美

NEWS CENTER
媒體新聞
Good start in 2021 | Welle Group wins six projects to treat leachate from the receiving bunker of incineration plants.
發布日期:2021-03-01 瀏覽次數:4576

In the case of very wet waste, a not inconsiderable part of the water contained in the waste is squeezed out in the receiving bunkers of incineration plants due to the stack weight. This highly contaminated wastewater is collected at the bunker bottom and treated using technically challenging processes such as anaerobic technology, membrane bioreactors as well as nanofiltration and reverse osmosis. The removal of water from the waste increases the calorific value and thus the efficiency of the downstream combustion process. WELLE Group, as one of the market leaders in this application, has already been able to underwrite 6 projects in 2021.  

 

In the city of Handan (Hebei Province), a plant for 450 m3/d is being built on behalf of Northwest Power Construction First Engineering Co., Ltd. In addition to the turnkey delivery, a 2-year operation management has been contracted. Besides, the other two orders both with the scale of 250m3/d were placed by Northwest Power Construction Third Engineering Co., Ltd in Handan city, which respectively in Handan Eastern Recycling Industrial Park and Cixian ( a county under Handan City).

 

Two orders were placed by Shanghai SUS Environment Co, Ltd. One wastewater treatment order was placed for an incineration plant in Shunping. Shunping is a county in the west-central part of Hebei province, China. The scope of supply consists of technical services as well as equipment supply and after-sales service. Another order was placed for Qianzishan (Wuhan city). The capacity of this plant is 450 m3/d. In Qianzishan, a two-year operation management is part of the contract.   

 

A sixth plant for the treatment of wastewater from the receiving bunkers of incineration plants was obtained in Dingxi (Gansu province. ) The plant there will treat 250 m3/d. The customer is Zhejiang Wangneng Environment Co., Ltd.

 

Pu Yanxin, Vice President of the WELLE Group and General Manager of the Water Business Unit says: "These projects won in 2021 show the strength of the WELLE Group in this application. To treat wastewater from receiving bunkers, the world's first plant for this wastewater application was built by WELLE in 2005. WELLE Group is the international market leaders in Bunker waste water treatment. Our success is a sign of our innovative strength. We are pleased that we will be able to further expand our strong position in 2021. And we are pleased about the continued strong trust of our customers. Thank you very much for that!"

 


主站蜘蛛池模板: 衡南县| 岳阳市| 登封市| 西昌市| 玉山县| 莲花县| 时尚| 宾川县| 桃源县| 隆尧县| 蕲春县| 大名县| 渭南市| 咸阳市| 涟水县| 山阴县| 仁化县| 怀化市| 海城市| 沈阳市| 庄浪县| 乌兰县| 安义县| 临沧市| 临漳县| 罗平县| 禹州市| 葫芦岛市| 兴业县| 衡山县| 郴州市| 蛟河市| 澎湖县| 秦皇岛市| 沂水县| 汾西县| 大石桥市| 巍山| 闽清县| 焦作市| 礼泉县|